ADNOC is building a two-train LNG export plant at Al Ruwais with a capacity of 9.6 million tonnes per year (two 4.8 mtpa trains), designed to run on grid power instead of gas turbines. ADNOC says about 90% of capacity is committed under long-term agreements and commercial operations are scheduled for 2028.
- Owner
- ADNOC (60%)ADNOC — press releases · as of 7 Jul 2026 ↗
- Main contractor
- Technip Energies, JGC Corporation and NMDC Energy (joint venture)
- Location
- Al Ruwais Industrial City, Al Dhafra, Abu Dhabi
- Expected
- Commercial operation in 2028
- Status checked
- 27 Sep 2026
Verified · updated 4 Oct 2026
Key facts
$5.5 bn
Awarded contract
NMDC Group·Awarded Jun 2024·source dated 13 Jun 2024·updated 4 Oct 2026·About this indicator